Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Şentürk, H A and Yazici, G (2004) Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project. Journal of Construction Engineering and Management, 130(03), 449–54.

Abudayyeh, O, Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of Trends in Construction Research: 1985–2002. Journal of Construction Engineering and Management, 130(03), 433–9.

Bossink, B A G (2004) Managing Drivers of Innovation in Construction Networks. Journal of Construction Engineering and Management, 130(03), 337–45.

Christini, G, Fetsko, M and Hendrickson, C (2004) Environmental Management Systems and ISO 14001 Certification for Construction Firms. Journal of Construction Engineering and Management, 130(03), 330–6.

Fang, D P, Huang, X Y and Hinze, J (2004) Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(03), 424–32.

  • Type: Journal Article
  • Keywords: Safety; Construction industry; China; Bench marks; construction industry; safety; accidents; project management; labour resources;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(424)
  • Abstract:
    This paper presents information by which to measure safety management performance on construction sites. In China, the conventional construction safety benchmarking approach is to assess safety performance by evaluating the physical safety conditions on site as well as the accident records, while no attention has been paid to the management factors that influence site safety. This paper is to identify the key factors that influence safety management and to develop a method for measuring safety management performance on construction sites. Based on the survey and interview data collected on safety management factors in 82 construction projects in China, the safety management index as a means to evaluate real-time safety management performance by measuring key management factors was developed. The quantified factors were compared with the commonly accepted physical safety performance index, which was derived from inspection records of physical safety conditions, accident rates, and the satisfaction of the project management team. Multifactor linear regression was conducted and the result indicates that safety management performance on site is closely related to organizational factors, economic factors, and factors related to the relationship between management and labor on site. Based on this benchmarking study, a practical safety assessment method was developed and then implemented on six construction projects. The results show that this method can be an effective tool to evaluate safety management on construction projects.

Gransberg, D D, Karaca, I and Senadheera, S (2004) Calculating Roller Requirements for Chip Seal Projects. Journal of Construction Engineering and Management, 130(03), 378–84.

Han, S H, Diekmann, J E, Lee, Y and Ock, J H (2004) Multicriteria Financial Portfolio Risk Management for International Projects. Journal of Construction Engineering and Management, 130(03), 346–56.

Moussourakis, J and Haksever, C (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(03), 307–14.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2004) Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia. Journal of Construction Engineering and Management, 130(03), 315–21.

O’Connor, J T and Yang, L (2004) Project Performance versus Use of Technologies at Project and Phase Levels. Journal of Construction Engineering and Management, 130(03), 322–9.

Peng, J (2004) Structural Modeling and Design Considerations for Double-Layer Shoring Systems. Journal of Construction Engineering and Management, 130(03), 368–77.

Pietroforte, R and Stefani, T P (2004) ASCE Journal of Construction Engineering and Management: Review of the Years 1983–2000. Journal of Construction Engineering and Management, 130(03), 440–8.

Seo, S, Aramaki, T, Hwang, Y and Hanaki, K (2004) Fuzzy Decision-Making Tool for Environmental Sustainable Buildings. Journal of Construction Engineering and Management, 130(03), 415–23.

Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.

Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.

Warszawski, A and Sacks, R (2004) Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. Journal of Construction Engineering and Management, 130(03), 357–67.

Zayed, T M and Halpin, D W (2004) Quantitative Assessment for Piles Productivity Factors. Journal of Construction Engineering and Management, 130(03), 405–14.

Zayed, T M and Halpin, D W (2004) Simulation as a Tool for Pile Productivity Assessment. Journal of Construction Engineering and Management, 130(03), 394–404.